LIV Student, Sheffield

CURTAIN WALLING REMEDIATION SURVEY & REPLACEMENT

Client Details

Client / Stakeholders: LIV Student Accommodation / WSP Professional Services
Location: LIV Student Accommodation (West Elevation Commercial Space), Sheffield
Surveyor Firm: Trident Facades (Lead Surveyor / Technical Manager: Ben Simpson)
Project Code: JO-0731 (Survey Report 001)

PHASE 1: DIAGNOSTIC AND INVESTIGATIVE SURVEY

Scope and Investigative Services

Executed an intrusive technical investigation on the West Elevation following multiple glass unit failures.
Uncovered internal base connections, removed external cappings, pressure plates, sills, and pressings to inspect waterproofing, thermal breaks, and torque values.
Evaluated structural integrity, slab-edge load transfers, and system compliance against SF52 design standards.
Applied laser control datums across mullions to check transom level tolerances and air gap clearances.

Key Survey Findings

Structural Design Deviations: Substituted concrete upstands with timber battens and blockwork, stripped 8 mm base plates from spigots, and used unapproved teck screws instead of 2x M10 dead-load through bolts.

Cantilevered Slab Stress & Bowing: First-floor screens cantilevered over slab edges with as little as 30 mm purchase on concrete without engineered steel angle supports, resulting in bowed brackets and unisolated pivoting base plates.

Workmanship & Tolerance Errors: Transoms installed out of tolerance, compromising the mandatory 7.5 mm clear air/drainage gap around glass perimeters and putting thermal/deflection strain on glass edges.

Glazing & Component Failures: Used narrow PVC packers over aluminum glazing shoes, causing point-loading on the inner glass pane; missing EPDM seals, crushed thermal breaks, and uncompressed louvre gaskets were also identified.

PHASE 2: REMEDIATION AND REPLACEMENT WORKS

Scope and Contracting Services

Complete removal and safe disposal of existing, defective glazed units and curtain walling frames.

Supply and fit of brand-new replacement curtain walling frames and double-glazed units.

Substrate and spigot reconstruction, including casting structural concrete upstands to original specification with newly engineered spigots and 8 mm base plates.

Installation of engineered steel transfer plates beneath first-floor cantilevered sections to safely transfer grid loads back to the slab.

Full precision re-erection of the SF52 system to strict tolerances (+2 mm) with new gaskets and proper 7.5 mm expansion clearances.