Existing façade review – Reviewing available surveys, drawings, assessments and project information to establish the existing rainscreen system and removal requirements.
Façade investigation and opening-up – Undertaking targeted opening-up where required to establish the construction behind the rainscreen and identify concealed components.
Site preparation and protection – Preparing the work area and protecting surrounding finishes, occupied areas and vulnerable building elements.
Scaffolding and MEWP access – Providing or coordinating suitable access arrangements for controlled removal across the affected elevations.
Temporary weather protection – Protecting exposed areas of the building from weather while the rainscreen system is being removed.
Controlled panel removal – Carefully dismantling and removing rainscreen panels in accordance with the planned sequence of works.
Rail, bracket and fixing removal – Removing associated support rails, brackets, fixings and other components where included within the removal scope.
Insulation and membrane removal – Removing defective or redundant insulation, membranes and associated components where required by the project scope.
Exposure of underlying construction – Exposing the backing wall, insulation, membranes, cavity and other concealed elements for assessment or preparation.
Protection of retained construction – Protecting elements of the existing wall system that are to remain as part of the subsequent works.
Segregation and disposal – Removing waste materials from site and arranging appropriate segregation and disposal in accordance with the project requirements.
Preparation for replacement works – Leaving the exposed façade in a suitable condition for repairs, preparation or installation of the replacement rainscreen system.a