Investigation and opening-up – Undertaking targeted intrusive investigation where fire-stopping arrangements are concealed or the existing construction cannot be established from available information.
Defect assessment – Identifying missing, damaged, incomplete or incorrectly installed fire-stopping arrangements and establishing the affected areas.
Removal of defective materials – Carefully removing defective or unsuitable fire-stopping components where required to prepare the interface for remediation.
Replacement fire stopping – Installing appropriate fire-stopping systems to the required interfaces in accordance with the approved design and system requirements.
Perimeter fire stopping – Addressing fire-stopping interfaces around external wall systems, openings, floor slabs and other relevant junctions.
Interface remediation – Addressing gaps and defects around windows, curtain walling, cladding, structural elements and other façade interfaces.
Cavity barrier coordination – Coordinating fire-stopping works with cavity barriers where both systems are affected.
Cladding and insulation coordination – Integrating fire-stopping remediation with associated cladding, insulation and external wall works.
Completion and documentation – Completing remedial works and providing relevant project documentation for the completed installation.