Existing façade review – Reviewing available surveys, assessments, drawings and previous reports to establish the existing timber cladding system and known defects.
Façade investigation and opening-up – Investigating the timber cladding, support framing, ventilation arrangements, insulation and interfaces where further information is required.
Remediation strategy – Establishing the extent of replacement and the appropriate approach for the affected elevations.
Design and specification – Developing the replacement system, including timber species, treatment, support arrangements, ventilation, fixings, cavity barriers, fire stopping and interface details.
Timber cladding removal – Carefully removing existing timber boards and associated battens, fixings and defective support components.
Substrate and backing preparation – Inspecting and preparing the exposed construction, including repairs or replacement of defective components where required.
Ventilated cavity installation – Providing appropriate cavity and ventilation arrangements behind the replacement cladding.
Cavity barriers and fire stopping – Installing or reinstating required fire protection within the external wall system and around relevant interfaces.
Support systems and fixings – Installing new battens, rails, brackets or fixings as required by the replacement system.
Replacement timber cladding – Supplying and installing the specified timber cladding system, including associated trims and detailing.
Interfaces and weathering – Completing junctions around windows, doors, roofs, balconies and other façade interfaces to provide appropriate weathering and drainage.
Installation and completion – Completing the installation, making good, carrying out final inspections and addressing any identified snags.