Existing construction review – Reviewing available surveys, assessments, drawings and reports to establish the curtain wall construction and identified fire-stopping requirements.
Targeted investigation and opening-up – Investigating concealed interfaces where the existing construction or condition cannot be established from available information.
Defect assessment – Identifying missing, damaged, incomplete or incorrectly installed fire-stopping components and assessing the extent of the affected areas.
Removal of defective materials – Carefully removing defective or unsuitable fire-stopping components where required to prepare the interface for remediation.
Replacement fire stopping – Installing appropriate fire-stopping systems to the required interfaces in accordance with the approved design and system requirements.
Cavity barriers – Installing or reinstating cavity barriers where required within the external wall or curtain wall interface.
Interface sealing – Addressing gaps and openings at relevant junctions to provide the required continuity of the fire-stopping arrangement.
Adjacent façade repairs – Coordinating associated repairs to surrounding façade components where these affect the fire-stopping interface.
Completion and documentation – Completing remedial works and providing relevant project documentation for the completed installation.