Existing façade review – Reviewing available surveys, drawings, assessments and other project information to establish the existing timber cladding system and planned removal requirements.
Façade investigation and opening-up – Where required, undertaking targeted opening-up to establish the construction behind the timber cladding and identify concealed components.
Site preparation and protection – Preparing the work area and protecting surrounding finishes, occupied areas and vulnerable building elements.
Scaffolding and MEWP access – Providing or coordinating suitable access arrangements for safe removal across the affected elevations.
Temporary weather protection – Protecting exposed areas of the building during removal where the underlying construction is temporarily exposed.
Controlled timber cladding removal – Carefully dismantling and removing timber boards and associated components in accordance with the planned sequence of works.
Battens, rails and fixing removal – Removing associated battens, rails, brackets, fixings and defective support components where included within the removal scope.
Exposure of underlying construction – Exposing the backing construction, insulation, membranes and other concealed components for assessment or preparation.
Protection of underlying construction – Taking appropriate measures to protect exposed construction from weather and damage during the works.
Segregation and disposal – Removing waste materials from site and arranging appropriate segregation and disposal in accordance with the project requirements.
Preparation for replacement works – Leaving the exposed façade in a suitable condition for subsequent repairs, preparation or installation of the replacement system.