Façade condition surveys
Assessing the current state of the external wall, cladding and associated components.
External wall surveys
A wider assessment of the full external wall build-up, not just the visible cladding.
Intrusive investigations and opening-up
Physically exposing sample areas to confirm construction and condition where drawings are missing, outdated, or unreliable.
Cladding investigations
Identifying cladding material, fixing method and fire performance.
PAS 9980 assessments
Fire risk appraisals of external walls, carried out to the current industry methodology.
FRAEW
Fire Risk Appraisal of External Walls, the detailed assessment that typically follows an initial fire risk assessment where external wall risk is flagged.
EWS1
External Wall System assessments, used to evidence external wall fire safety, most commonly for lending and valuation purposes.